جولات ترفيهية · حلول المتنزهات · التسليم العالمي
مشروع العملاء

Non-Powered Family Park Delivered to I-City, Malaysia (USD 125,900)

جنوب شرق آسياMalaysia

Non-Powered Family Park Delivered to I-City, Malaysia - delivered by DINIS. Project overview Country: Malaysia Client: I-City Order value: USD 125,900 Scope: equipment supply with layout, capacity and documentation support What this project had to resolve Non-powered attractions…

مناقشة مشروع مماثل

Non-Powered Family Park Delivered to I-City, Malaysia – delivered by DINIS.

Malaysia amusement park project delivered by DINIS
Malaysia amusement park project delivered by DINIS

Project overview

  • دولة: Malaysia
  • Client: I-City
  • Order value: USD 125,900
  • Scope: equipment supply with layout, capacity and documentation support

What this project had to resolve

  • Non-powered attractions earn through dwell time, so the layout had to keep families moving between structures.
  • Evening operation required lighting and safety surfaces to be planned with the structures, not added later.
  • The park needed a family offer that does not depend on ride operators for every structure.

What was delivered

  • Non-powered adventure structures
  • Family play and climbing equipment
  • Lighting for evening operation

How delivery was run

  1. Requirement confirmation – دولة, موقع, visitor profile and equipment list fixed in writing.
  2. Layout and configuration – Ride positions, capacity and technical configuration agreed before production.
  3. Production and pre-assembly – Fabrication with inspection records, then a factory test run.
  4. Packing and shipment – Packing list, container plan and shipping documents on the agreed schedule.
  5. Delivery and installation support – Site guidance, installation support and handover documentation.

Buyer takeaway

Decide the equipment mix from the visitor profile and the operating routine, not from a single product price. Site conditions, power supply, maintenance capacity and the opening schedule have to match before the order is placed.

Questions buyers ask before starting

Can the equipment be adapted to our site?
Layout, capacity and appearance are agreed per project from the site drawings and the target visitor profile.

Who handles foundations and power supply?
Civil works, foundations and power supply to the ride are normally separate scopes; the equipment package includes the drawings the site contractor needs.

What documentation comes with the equipment?
Operation and maintenance documentation, inspection records and the packing list are handed over with delivery.