ATRACCIONES ATRACTIVOS · SOLUCIONES DE PARQUES · ENTREGA GLOBAL
PROYECTO DEL CLIENTE

Parque familiar sin electricidad entregado a I-City, Malasia (Dólar estadounidense 125,900)

Sudeste AsiáticoMalasia

This Malaysia family park was delivered to I-City with a USD 125,900 valor del pedido, and it runs into the evening. Non-powered attractions earn through dwell time, so the layout had to keep families moving. Compare the structures used…

Discutir un proyecto similar

Este Malaysia family park was delivered to I-City with a USD 125,900 valor del pedido, and it runs into the evening. Non-powered attractions earn through dwell time, so the layout had to keep families moving. Compare the structures used in our outdoor family playsets y roundabout playground equipment.

Malaysia amusement park project delivered by DINIS
Malaysia amusement park project delivered by DINIS

Proyecto de un vistazo

Artículo Detalle
País Malasia
Cliente I-City
Sitio Family park, evening operation
Valor del pedido Dólar estadounidense 125,900
Alcance Non-powered adventure package with lighting, family play and climbing equipment
Entrega Container shipment with installation layout and guidance

Malaysia family park: what I-City ordered

  • País: Malasia
  • Cliente: I-City
  • Valor del pedido: Dólar estadounidense 125,900
  • Alcance: suministro de equipos con diseño, soporte de capacidad y documentación

Evening operation and family flow

  • Non-powered attractions earn through dwell time, so the layout had to keep families moving between structures.
  • Evening operation required lighting and safety surfaces to be planned with the structures, not added later.
  • The park needed a family offer that does not depend on ride operators for every structure.

What DINIS delivered to I-City

  • Non-powered adventure structures
  • Family play and climbing equipment
  • Lighting for evening operation

Lista de equipos: what DINIS supplied to I-City

The park runs into the evening, so lighting and safety surfaces were specified with the structures rather than added afterwards.

  • Non-powered adventure structures – the climbing and balancing route that carries families through the park.
  • Family play and climbing equipment – elements sized so parents and children can use the same area at the same time.
  • Lighting for evening operation – the lighting package that makes the park usable after dark, which is when a family attraction earns most.
  • Safety surfacing guidance – the layout notes that cover the fall zones around each structure.
  • Installation layout and manual – the documents a local installer works from, plus the maintenance routine for the operator.

How the non-powered park was delivered

  1. Confirmación de requisitos – País, sitio, Perfil del visitante y lista de equipos fijados por escrito..
  2. Diseño y configuración – Posiciones de conducción, Capacidad y configuración técnica acordadas antes de la producción..
  3. Producción y premontaje – Fabricación con registros de inspección., luego una prueba de fábrica.
  4. Embalaje y envío – Lista de embalaje, Plano del contenedor y documentos de envío según el cronograma acordado..
  5. Soporte de entrega e instalación. – Guía del sitio, soporte de instalación y documentación de entrega.

Why lighting changes a non-powered park

Decidir la combinación de equipos a partir del perfil del visitante y la rutina operativa., no de un solo precio de producto. Condiciones del sitio, fuente de alimentación, La capacidad de mantenimiento y el calendario de apertura deben coincidir antes de realizar el pedido..

Questions buyers ask about non-powered parks

¿Se puede adaptar el equipo a nuestro sitio??
Disposición, La capacidad y la apariencia se acuerdan según el proyecto a partir de los planos del sitio y el perfil del visitante objetivo..

¿Quién se encarga de las cimentaciones y el suministro de energía??
Obras civiles, Los cimientos y el suministro de energía a la atracción normalmente son ámbitos separados.; El paquete del equipo incluye los planos que el contratista del sitio necesita..

¿Qué documentación viene con el equipo??
Documentación de operación y mantenimiento., Los registros de inspección y la lista de embalaje se entregan con la entrega..

QUE INCLUIR
  • País
  • Tamaño o plan del sitio
  • Interior o exterior
  • Paseos que tienes en mente
  • Fecha de apertura

Prefiero hablar? envíanos whatsapp, o correo electrónico [email protected]

Formulario de contacto 1

Obtenga una cotización gratuita