Este Georgia park equipment package was supplied to KASS GROUP for a resort development, con un dólar 653,000 order value across roughly 10,000 m2. The park had to work for hotel guests and day visitors at the same time. The main models are covered on our paseos en tren de turismo y carousel pages.


Project at a glance
| Artículo | Detail |
|---|---|
| País | Georgia |
| Client | KASS GROUP |
| Sitio | Resort development, roughly 10,000 m2 |
| Order value | Dólar estadounidense 653,000 |
| Alcance | Park equipment package with layout, capacity and documentation support |
| Entrega | Sequenced for phased installation before the resort opened |
Georgia park equipment: scope and order value
- País: Georgia
- Client: KASS GROUP
- Order value: Dólar estadounidense 653,000
- Alcance: equipment supply with layout, capacity and documentation support
Serving hotel guests and day visitors at once
- The park sits next to a resort area, so the ride mix had to work for hotel guests and day visitors at the same time.
- Around 10,000 m² had to be planned as one coherent visitor route instead of separate ride plots.
- Equipment had to be sequenced for phased installation so the development could open progressively.
What DINIS delivered to KASS GROUP
- Carousel and family rides
- Sightseeing train
- Disposición, capacity and documentation support
Equipment list: what DINIS supplied to the resort park
The park sits beside a resort, so the package had to work for hotel guests in the morning and day visitors at the weekend. That shaped both the ride mix and the order the equipment arrived in.
- Carrusel – the family anchor that parents recognise immediately and children ask for.
- Family rides – the supporting attractions that keep a family group walking the route instead of leaving after one ride.
- Sightseeing train – the transport attraction that moves guests around a 10,000 m2 site and earns a ticket while doing it.
- Layout and capacity study – the site plan that positioned each ride, the queue and the walking route before installation started.
- Documentation and handover – drawings, manuals and records for the resort’s own maintenance team.
Phased installation for a resort opening
- Confirmación de requisitos – País, sitio, visitor profile and equipment list fixed in writing.
- Layout and configuration – Ride positions, capacity and technical configuration agreed before production.
- Production and pre-assembly – Fabricación con registros de inspección., then a factory test run.
- Packing and shipment – Lista de embalaje, container plan and shipping documents on the agreed schedule.
- Delivery and installation support – Guía del sitio, soporte de instalación y documentación de entrega.
Why phasing matters on a resort park
Decide the equipment mix from the visitor profile and the operating routine, not from a single product price. Site conditions, fuente de alimentación, maintenance capacity and the opening schedule have to match before the order is placed.
Questions buyers ask about resort park equipment
Can the equipment be adapted to our site?
Disposición, capacity and appearance are agreed per project from the site drawings and the target visitor profile.
Who handles foundations and power supply?
Civil works, foundations and power supply to the ride are normally separate scopes; the equipment package includes the drawings the site contractor needs.
What documentation comes with the equipment?
Operation and maintenance documentation, inspection records and the packing list are handed over with delivery.
- País
- Tamaño o plan del sitio
- Interior o exterior
- Paseos que tienes en mente
- Fecha de apertura
Prefiero hablar? envíanos whatsapp, o correo electrónico [email protected]



