Ce Georgia park equipment package was supplied to KASS GROUP for a resort development, avec un USD 653,000 order value across roughly 10,000 m2. The park had to work for hotel guests and day visitors at the same time. The main models are covered on our promenades en train de visites et carousel pages.


Project at a glance
| Article | Detail |
|---|---|
| Pays | Géorgie |
| Client | GROUPE KASS |
| Site | Resort development, roughly 10,000 m2 |
| Valeur de la commande | USD 653,000 |
| Portée | Park equipment package with layout, soutien en matière de capacité et de documentation |
| Livraison | Sequenced for phased installation before the resort opened |
Georgia park equipment: scope and order value
- Pays: Géorgie
- Client: GROUPE KASS
- Valeur de la commande: USD 653,000
- Portée: fourniture de matériel avec aménagement, soutien en matière de capacité et de documentation
Serving hotel guests and day visitors at once
- The park sits next to a resort area, so the ride mix had to work for hotel guests and day visitors at the same time.
- Autour 10,000 m² had to be planned as one coherent visitor route instead of separate ride plots.
- Equipment had to be sequenced for phased installation so the development could open progressively.
What DINIS delivered to KASS GROUP
- Carousel and family rides
- Sightseeing train
- Mise en page, soutien en matière de capacité et de documentation
Equipment list: what DINIS supplied to the resort park
The park sits beside a resort, so the package had to work for hotel guests in the morning and day visitors at the weekend. That shaped both the ride mix and the order the equipment arrived in.
- Carrousel – the family anchor that parents recognise immediately and children ask for.
- Family rides – the supporting attractions that keep a family group walking the route instead of leaving after one ride.
- Sightseeing train – the transport attraction that moves guests around a 10,000 m2 site and earns a ticket while doing it.
- Layout and capacity study – the site plan that positioned each ride, the queue and the walking route before installation started.
- Documentation and handover – drawings, manuals and records for the resort’s own maintenance team.
Phased installation for a resort opening
- Confirmation des besoins – Pays, site, visitor profile and equipment list fixed in writing.
- Disposition et configuration – Positions de conduite, capacity and technical configuration agreed before production.
- Production et pré-assemblage – Fabrication avec dossiers d'inspection, puis un test en usine.
- Emballage et expédition – Liste de colisage, container plan and shipping documents on the agreed schedule.
- Assistance à la livraison et à l'installation – Conseils sur le site, assistance à l'installation et documentation de transfert.
Why phasing matters on a resort park
Decide the equipment mix from the visitor profile and the operating routine, pas à partir du prix d'un seul produit. Site conditions, alimentation, maintenance capacity and the opening schedule have to match before the order is placed.
Questions buyers ask about resort park equipment
Le matériel peut-il être adapté à notre site?
Mise en page, capacity and appearance are agreed per project from the site drawings and the target visitor profile.
Qui s'occupe des fondations et de l'alimentation électrique?
Travaux de génie civil, foundations and power supply to the ride are normally separate scopes; the equipment package includes the drawings the site contractor needs.
Quelle documentation est fournie avec l'équipement?
Documentation d'exploitation et d'entretien, inspection records and the packing list are handed over with delivery.
- Pays
- Taille ou plan du site
- Intérieur ou extérieur
- Les manèges que vous avez en tête
- Date d'ouverture
Je préfère parler? WhatsApp nous, ou par email [email protected]



