A resort park in Iraq ordered a complete equipment package – pendulum, aerial shooting ride, carrusel, bumper cars and family rides – so the park could open as a full-day destination rather than a single attraction.

Project overview
- Client: Hussein Holy Shrine
- Order value: USD 222,000
- Scope: equipment supply with layout, capacity and documentation support
Location: Irak. The project was delivered by DINIS as an equipment supply with layout, capacity and documentation support.
What this project had to resolve
- A mixed package has to be sequenced so the park can open in phases instead of waiting for every item.
- Civil works, power supply and ride foundations are separate contracts and had to be coordinated with the equipment list.
- Several ride types mean several maintenance routines, so documentation and spare parts had to be organised together.
What was delivered
- Pendulum ride
- Aerial shooting ride
- Carrusel, bumper cars and family ride package
- Documentation and spare parts list
How delivery was run
- Requirement confirmation – País, sitio, visitor profile and equipment list were fixed in writing.
- Layout and configuration – Ride positions, capacity and the technical configuration were agreed before production.
- Production and pre-assembly – Fabrication with inspection records, then a factory test run.
- Packing and shipment – Packing list, container plan and shipping documents followed the agreed schedule.
- Delivery and installation support – Site guidance, installation support and handover documentation.
What changed after delivery
The resort can offer a full visit cycle – several ride types plus food and accommodation – instead of a short stop for one attraction.
Buyer takeaway
Decide the ride mix from the visitor profile and the operating routine, not from a single product price. The equipment list, the site conditions and the maintenance capacity have to match before the order is placed.
Questions buyers ask before starting
Can the equipment be adapted to our site?
Layout, capacity and appearance are agreed per project. Site drawings and the target visitor profile are what the configuration is built from.
Who handles foundations and power supply?
Civil works, foundations and the power supply to the ride are normally separate scopes. The equipment package includes the drawings and specifications the site contractor needs.
What documentation comes with the equipment?
Operation and maintenance documentation, inspection records and the packing list are handed over with the delivery; installation support can be arranged separately.