MANÈGES · SOLUTIONS PARCS · LIVRAISON MONDIALE
MARCHÉ PRIORITAIRE

Europe

La direction actuelle met l'accent sur les carrousels, trains touristiques, chaises volantes et roues d'observation.

PROJETS RÉGIONAUX

Projets livrés sur ce marché.

Commandes de référence de cette région, avec la liste du matériel, le montant de la commande et les bons de livraison.

MARKET NOTES

What changes when you buy in Europe.

Three checks run before a quotation leaves the office. They are the reason two parks can order the same ride and receive different specifications.

01

Power and control

Voltage and frequency are confirmed before the control cabinet is built, not after it lands.

02

Container and inland route

Loading is planned per model, because the inland leg usually decides the delivered price.

03

Climate and site

Temperature, humidity and altitude are checked against the operating range on each specification sheet.