A Lithuanian amusement park added family ride capacity with equipment chosen around existing visitor flow, floor space and the park’s short operating season.


Project overview
- Client: UAB Pramogos
- Order value: EUR 156,276
- Scope: equipment supply with layout, capacity and documentation support
The order was a double-decker carousel for the park.
Location: Lithuania. The project was delivered by DINIS as an equipment supply with layout, capacity and documentation support.
What this project had to resolve
- A short season means the ride has to start earning immediately after installation.
- The new ride must not compete with attractions the park already operates.
- Maintenance has to be possible with the staff and workshop the park already has.
What was delivered
- Family ride equipment package
- Factory inspection records
- Operation and maintenance documentation
How delivery was run
- Requirement confirmation – Pays, site, visitor profile and equipment list were fixed in writing.
- Layout and configuration – Ride positions, capacity and the technical configuration were agreed before production.
- Production and pre-assembly – Fabrication with inspection records, then a factory test run.
- Packing and shipment – Packing list, container plan and shipping documents followed the agreed schedule.
- Delivery and installation support – Site guidance, installation support and handover documentation.
What changed after delivery
The park broadened its family offer without waiting for a new building or a longer construction window.
Buyer takeaway
Decide the ride mix from the visitor profile and the operating routine, not from a single product price. The equipment list, the site conditions and the maintenance capacity have to match before the order is placed.
Questions buyers ask before starting
Can the equipment be adapted to our site?
Layout, capacity and appearance are agreed per project. Site drawings and the target visitor profile are what the configuration is built from.
Who handles foundations and power supply?
Civil works, foundations and the power supply to the ride are normally separate scopes. The equipment package includes the drawings and specifications the site contractor needs.
What documentation comes with the equipment?
Operation and maintenance documentation, inspection records and the packing list are handed over with the delivery; installation support can be arranged separately.