Ce samba tower ride in Azerbaijan was ordered by Safari Co. LLC in Baku for a park that was still under construction. La valeur de la commande était de USD 30,500.
New parks buy differently from operating ones. The ride has to fit a plot that is already marked out and a power supply that is already specified, and it has to open with the rest of the site.

A family tower ride for a park that is still being built
UN tour de samba sits between a carousel and a drop tower. The cabins lift, rotate and swing, but the motion stays gentle enough for children to ride with their parents.
For a first season, that matters more than height. It gives the park a ride that photographs well on opening day without needing the civil works of a tower.
Samba tower capacity: eight cabins, trente-deux cavaliers
Chaque cabine peut accueillir deux adultes et deux enfants, ou quatre enfants, so a family buys four seats at once. The cycle runs two to three minutes and is adjustable, which lets the operator shorten it on a busy afternoon.
La puissance installée est 20 kW: 3 kW pour la rotation, 15 kW pour la pompe hydraulique et 2 kW pour l'éclairage. La structure se dresse 12 m with a slewing diameter of about 8.3 m.
Delivering a samba tower in one container
The ride ships in a single 40HQ at about 4,600 kg, so the site needed one unloading crane and one delivery slot. La production tourne autour 35 jours à compter de la commande confirmée.
Because the park was still building, the tower could go in while the surrounding works continued. That is the practical advantage of a one-container family ride on an unfinished site.
What a new park needs before the tower arrives
- A finished base on the marked plot
- Le 20 kW supply connected before the container lands
- The fence line set outside the 8.3 m slewing circle
- The queue and ticket point positioned before opening day
Parks fitting out a family zone at the same stage usually pair it with the tour de tasse de café et le carrousel pour enfants.
Questions soulevées par ce projet
Can the ride open before the rest of the park is finished?
Oui. Un conteneur 40HQ, one base and a 20 kW supply are all the tower needs, so it can open while the surrounding works are still running.
What has to be ready before delivery?
A finished base on the marked plot, the supply connected, and the fence line set outside the 8.3 m slewing circle. Those three items decide whether the container can be unloaded and run.